JAPANESE
Japan Real Estate Insights by estie
Japan Real Estate Insights by estie

Daiwa House Industry Breaks Ground on Multi-Tenant Logistics Facility in Fukuroi, Shizuoka

Daiwa House Industry Breaks Ground on Multi-Tenant Logistics Facility in Fukuroi, Shizuoka

Daiwa House Industry on March 23, 2026, broke ground on DPL Shizuoka Fukuroi, a multi-tenant logistics facility in Fukuroi, Shizuoka Prefecture. Completion is scheduled for the end of January 2027, with tenant move-ins expected to begin in February of the same year. The project marks the company’s 16th logistics facility development in Shizuoka Prefecture.

The development site is located about 1 kilometer from the Tomei Expressway’s Fukuroi interchange and about 10 kilometers from the Shin-Tomei Expressway’s Mori-Kakegawa interchange, with frontage on National Route 1. The facility will be a two-story steel-structure building with a Gross Floor Area of approximately 2,421 tsubo (approx. 80,033 sq. ft.). It will offer a floor load capacity of 1.5 tons per square meter and a clear height under beams of 5.5 meters, and is being developed as a multi-tenant facility that can accommodate up to two tenants. A 556.2-kilowatt solar power generation system will be installed, and the project is targeting a five-star BELS rating and Nearly ZEB or higher certification.

Daiwa House Industry currently operates a total of 15 logistics facilities in Shizuoka Prefecture, including DPL Kakegawa and DPL Shin-Fuji, with combined Gross Floor Area of approximately 443,000 square meters. The company positions the prefecture as a key node in its logistics network. It is also advancing a large-scale mixed-use development in Makinohara, Shizuoka Prefecture, combining commercial, industrial logistics, and residential uses, as it works to strengthen its business base across the prefecture.(see related article:Daiwa House Launches Large-Scale Mixed-Use Development “MAKINOHARA HILLS PROJECT” in Shizuoka

Key Facts

  • Property Name:

    DPL Shizuoka Fukuroi

  • Owner/Developer:

    Daiwa House Industry Co., Ltd.

  • Design and Construction:

    Nakamuragumi Co., Ltd.

  • Location:

    2969-1 Aza Ikenoya, Yamashina, Fukuroi, Shizuoka Prefecture, and 18 other parcels

  • Nearest Interchanges:

    Approx. 1 km from Tomei Expressway Fukuroi IC; approx. 10 km from Shin-Tomei Expressway Mori-Kakegawa IC

  • Construction Start:

    March 23, 2026

  • Completion:

    January 31, 2027

  • Number of Floors:

    2F / B0

  • Structure:

    Steel structure, seismic-resistant

  • Site Area:

    Approx. 2,360 tsubo (approx. 78,017 sq. ft.)

  • Gross Floor Area:

    Approx. 2,421 tsubo (approx. 80,033 sq. ft.)

  • Floor Load Capacity:

    1.5 t/sqm

  • Clear Height Under Beams:

    5.5 m

  • Number of Tenants:

    Up to 2