Cielia Tower Nakanoshima Completed as First Phase of Nakanoshima Area Redevelopment

Cielia Tower Nakanoshima Completed as First Phase of Nakanoshima Area Redevelopment

Cielia Tower Nakanoshima, developed by Kanden Realty & Development Co., Ltd., was completed on February 18, 2026. Located in Fukushima Ward, Osaka, the large-scale condominium tower rises 46 stories above ground, stands 168 meters tall, and comprises 364 residential units. Unit handover is scheduled for March 1, 2026. The project utilizes a fixed-term leasehold (superficies) with an approximately 70-year lease period.

The property is constructed of reinforced concrete (partially steel-framed) and has a Gross Floor Area of approximately 14,135 tsubo (approx. 467,272 sq. ft.). It is a four-minute walk from Shin-Fukushima Station on the JR Tozai Line. Obayashi Corporation served as the general contractor, employing its proprietary high-rise vibration control system, the Dual Frame System (D.F.S.). The building meets the ZEH-M Oriented standard and achieves net-zero CO2 emissions for the entire condominium through bulk high-voltage power reception supplying effectively carbon-free electricity derived from renewable energy sources.

The completion of this project marks the first wave of accelerating high-rise development in the Nakanoshima area. A twin-tower project by Kanden Realty & Development, NTT Urban Development and Sumitomo Corporation is currently underway, consisting of two buildings — 57 stories (205 meters tall) and 52 stories (approximately 197 meters tall) — totaling approximately 1,100 units, with completion scheduled for fiscal 2031. Anticipating the opening of a new Naniwasuji Line station in fiscal 2031, a large-scale redevelopment spanning approximately 9.6 hectares is progressing in the Nakanoshima 5-chome district.

Kanden Realty & Development is also participating in the Yodoyabashi Gate Tower project (29 stories, Gross Floor Area of approximately 40,000 tsubo [approx. 1,322,000 sq. ft.]) in the adjacent Yodoyabashi area, further strengthening its presence across the Nakanoshima and Yodoyabashi districts.

Nakanoshima Area High-Rise Developments

Property Name

Number of Floors

Height

Total Units

Completion

Developer

Cielia Tower Nakanoshima

46

168m

364

February 2026 (Completed)

Kanden Realty & Development

(Tentative) Nakanoshima 5-Chome 3-Banchi Project (2 Towers)

57 / 52

205m / approx. 197m

Approx. 1,100 (total)

FY2031

Kanden Realty & Development / NTT Urban Development / Sumitomo Corporation

Key Facts

  • Property Name: Cielia Tower Nakanoshima

  • Developer: Kanden Realty & Development Co., Ltd.

  • Location: 2-1-23 Fukushima, Fukushima-ku, Osaka, Osaka Prefecture

  • Access: 4-minute walk to Shin-Fukushima Station (JR Tozai Line); 5-minute walk to Nakanoshima Station (Keihan Nakanoshima Line); 5-minute walk to Fukushima Station (Hanshin Main Line); 7-minute walk to Fukushima Station (JR Osaka Loop Line)

  • Completion: February 18, 2026

  • Scheduled Handover: March 1, 2026

  • Number of Floors: 46F

  • Structure: Reinforced Concrete (partially Steel)

  • Site Area: Approximately 899 tsubo (approx. 29,719 sq. ft.)

  • Gross Floor Area: Approximately 14,135 tsubo (approx. 467,272 sq. ft.)

  • Total Units: 364

  • Unit Mix: 1LDK–4LDK

  • Unit Size: 45.98㎡–168.43㎡

  • Land Tenure: Fixed-Term Leasehold (Superficies), Master Lease Structure

  • Lease Term: Approximately 70 years

  • General Contractor: Obayashi Corporation

  • Architect / Supervisor: IAO Takeda Architects & Associates; Obayashi Corporation Osaka Main Office First-Class Architect Office