JAPANESE
Loading...
Japan Real Estate Insights by estie
/
Office
/

12-Story Mixed-Use Facility Opens in Front of Toyokawa Station, Led by Meitetsu City Design

12-Story Mixed-Use Facility Opens in Front of Toyokawa Station, Led by Meitetsu City Design

12-Story Mixed-Use Facility Opens in Front of Toyokawa Station, Led by Meitetsu City Design

FRONTIS TOYOKAWA, a mixed-use facility developed in Toyokawa, Aichi Prefecture, by a consortium with Meitetsu City Design as its representative, opened on November 15, 2026. It houses offices, a hotel, a multipurpose hall and retail.

The facility is a one-minute walk from Toyokawa Station on the JR Iida Line and a three-minute walk from Toyokawa-inari Station on the Meitetsu Toyokawa Line. The 12-story building has retail on the first floor, offices on the second to fifth floors, the multipurpose hall FRONTIS FORUM on the fifth floor, and a hotel on the sixth to 12th floors.

The hotel is Tabino Hotel lit Toyokawa Ekimae, operated by Sun Frontier Hotel Management, with 112 guest rooms. It is the first Tabino Hotel brand property in Aichi Prefecture. Office tenants include the investing companies OSG, Toyokawa Shinkin Bank and Kayama Kogyo, as well as Kyoeisha, Bathday and Ilex Sports Life.

The site is within the area of the Toyokawa Station East Land Readjustment Project at the east exit of JR Toyokawa Station, and the land is owned by Meitetsu City Design. Hakuyo Produce System, which plans, develops and operates retail facilities locally, handled the overall production, and four local companies, OSG, Hakuyo Corporation, Toyokawa Shinkin Bank and Kayama Kogyo, invested in the project.

Key Facts

  • Property Name: FRONTIS TOYOKAWA
  • Project Operator: Consortium including Meitetsu City Design Co., Ltd. (representative)
  • Investors: OSG Corporation / Hakuyo Corporation / Toyokawa Shinkin Bank / Kayama Kogyo Co., Ltd.
  • Overall Production: Hakuyo Produce System Co., Ltd.
  • Location: 5 Nihodori, Toyokawa-cho, Toyokawa, Aichi Prefecture, and others
  • Nearest Station(s): One-minute walk from Toyokawa Station on the JR Iida Line / Three-minute walk from Toyokawa-inari Station on the Meitetsu Toyokawa Line
  • Construction Start: May 2025
  • Opening: November 15, 2026
  • Number of Floors: 12F (steel frame construction)
  • Area: Site area of approximately 714 tsubo (approx. 25,400 sq. ft.) / Gross Floor Area of approximately 2,461 tsubo (approx. 87,600 sq. ft.)
  • Use: Office, banquet hall, hotel, retail
  • Floor Composition: 1F Retail / 2F-5F Office / 5F Multipurpose hall FRONTIS FORUM / 6F-12F Hotel Tabino Hotel lit Toyokawa (112 rooms)
  • Design: Onocom Design Center Co., Ltd.
  • Construction: Joint venture of Onocom and Nakamura Construction

Related Articles